Riad courtyard basin waterproofing in Palmeraie
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Palmeraie: we carry out riad courtyard basin waterproofing with waterproofing systems proven under the Marrakech climate — extreme summer heat, concentrated rain from November to March. You pay only after reading the quote: free, written and without obligation.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Riad courtyard basin waterproofing in Palmeraie: the job
For riad courtyard basin waterproofing in Palmeraie, the protocol is strict: free diagnosis, quote within 24 hours, application and tightness test before refilling. The patio basin, heart of the riad: careful waterproofing under zellige or tadelakt, discreet overflow, constant level guaranteed. Reference budget: 250–450 DH/m², written warranty included.
Trusted in Palmeraie
“A leak in the middle of the rainy season: fast response, temporary weatherproofing then the final repair at the quoted price.”
David K. · Palmeraie“I was looking for an alternative to full demolition: liquid membrane and the terrace was like new in three days. I wish I had called earlier.”
Nadia B. · Palmeraie“Water came through the living-room ceiling every time it rained. Survey on Thursday, quote the next day, work finished in four days. Not a drop since.”
Claire D. · PalmeraieThe Palmeraie context
In the Palmeraie, terraces match the scale of the villas: 150 to 400 m² of flat roof, often fitted out as a solarium, summer lounge or outdoor kitchen, on buildings surrounded by century-old palm trees. These large surfaces expand strongly under the sun: without movement joints and a flexible system, cracks are inevitable. Typical requests in the area: re-waterproofing 300 m² without closing down the villa, fixing leaks around pergolas anchored into the slab, waterproofing garden basins and water features. We plan these jobs zone by zone so the house stays liveable, with materials rated for high surface temperatures.
For riad courtyard basin waterproofing in Palmeraie, the survey is free and the quote firm: you know exactly what you pay before we start, and the warranty is in writing.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Riad courtyard basin waterproofing | 250–450 DH/m² | turnkey, finish included |
| Spa and jacuzzi waterproofing | 300–550 DH/m² | same service, different work |
| Patio fountain waterproofing | from 2,500 DH | same service, different work |
| Concrete pool waterproofing | 250–450 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Indicative 2026 prices, labour and materials included. The final amount is locked in writing after the free survey.
How we work: four steps
Free survey in Palmeraie
We come and measure on site, free of charge and without obligation: membrane condition, falls, drains, upturns and every weak point of your flat roof.
Written quote within 24 hours
You receive an offer itemised line by line: materials, labour, timelines. The price is firm and locked in writing.
Tidy, protected site
We protect stairwells, facades and plants; we work zone by zone and leave the site clean every evening.
Testing and written warranty
Water-tightness test before handover. You leave with a written warranty of up to 10 years and after-works follow-up.
Frequently asked questions: Riad courtyard basin waterproofing in Palmeraie
Yes: heat, steam, standing water. We use systems resistant to steam and thermal cycling, with high upturns on the walls and specific treatment of the floor-to-wall junction.
Allow 7 to 14 days after application ends, depending on the system (full curing is mandatory). We give you the refilling date in writing in the works schedule.
We handle the waterproofing of the shell and the fittings (skimmers, lights, jets). If the leak is in the buried pipework, we locate it and coordinate the repair with your pool contractor.
From 200 to 500 DH/m² of shell surface (floor + walls) depending on the system: flexible mortar under a finish 250–450 DH/m², epoxy as finish 220–400 DH/m². An 8×4 m pool usually runs 25,000–60,000 DH.
Before the rainy season, make your terrace safe
From November to March, an ignored leak costs up to 10 times the price of waterproofing. WhatsApp or form: we can be in Palmeraie within days for a free diagnosis.
+39 351 481 6739