Tank and cistern lining in Route de l’Ourika
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Route de l’Ourika: we carry out tank and cistern lining with waterproofing systems proven under the Marrakech climate — extreme summer heat, concentrated rain from November to March. You pay only after reading the quote: free, written and without obligation.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Tank and cistern lining in Route de l’Ourika: the job
For tank and cistern lining in Route de l’Ourika, the protocol is strict: free diagnosis, quote within 24 hours, application and tightness test before refilling. Certified potable-water lining for buried or rooftop cisterns and tanks: healthy water, protected walls, leaks stopped. Reference budget: 180–350 DH/m², written warranty included.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Tank and cistern lining | 180–350 DH/m² | turnkey, finish included |
| Waterproofing under mosaic and zellige | 280–500 DH/m² | same service, different work |
| Pool leak detection and repair | from 1,500 DH | same service, different work |
| Riad courtyard basin waterproofing | 250–450 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Indicative 2026 prices, labour and materials included. The final amount is locked in writing after the free survey.
How we work: four steps
Free on-site diagnosis
A specialist — not a salesman — comes in Route de l’Ourika to record measurements, moisture and critical points, and to understand what is really needed.
Firm offer, line by line
Within 24 hours, the written quote: the figure you read is the final one, valid and locked.
Fast, careful intervention
Agreed time slots, protection everywhere, certified materials: the house stays liveable during the works.
Handover and final check
Flood or hose test, before/after photos, ten-year warranty: everything is handed over in writing.
Trusted in Route de l’Ourika
“For tank and cistern lining they recommended the simplest solution, not the most expensive one. You can tell they are technicians, not salesmen.”
Mohammed A. · Route de l’Ourika“Detailed quote, no extras at the end of the job and a written 10-year warranty. Everyone should work this way.”
Mark T. · Route de l’Ourika“Perfect communication on WhatsApp from start to finish: I always knew what would happen the next day and who would be in my house.”
Nadia B. · Route de l’OurikaThe Route de l’Ourika context
The Ourika road has become the axis of new villas and small residential compounds with pools: a new building comes out of the ground there every week. On this axis we see two families of requests: villas at finishing stage whose owner wants the waterproofing secured before handover — checking the falls, the upturns, a flood test — and already-delivered terraces that leak after their first winter. Terraces here often double as a solarium with Atlas views: they must be both watertight and walkable, hence the success of traffic-grade resins and membranes under tiling. Dust from neighbouring sites also clogs the drains: drainage checks are part of our standard inspection.
In Route de l’Ourika, jobs like tank and cistern lining are among the most requested: with summers above 45 °C and rain concentrated in winter, a well-laid membrane and correct falls make the difference between a terrace that lasts and one that has to be redone.
Frequently asked questions: Tank and cistern lining in Route de l’Ourika
From 200 to 500 DH/m² of shell surface (floor + walls) depending on the system: flexible mortar under a finish 250–450 DH/m², epoxy as finish 220–400 DH/m². An 8×4 m pool usually runs 25,000–60,000 DH.
In Marrakech, summer evaporation reaches 1–2 cm a day, no more. If you lose more, or if the level drops with the pump off, it is a leak: we locate it without fully draining the pool.
Yes — it is the classic build-up of riad basins: two coats of flexible waterproofing mortar, then zellige laid with water-resistant adhesive and epoxy joints. Beautiful on top, watertight underneath.
Yes: heat, steam, standing water. We use systems resistant to steam and thermal cycling, with high upturns on the walls and specific treatment of the floor-to-wall junction.
Free quote for tank and cistern lining in Route de l’Ourika
Message us on WhatsApp or fill in the form above: free survey, written offer within 24 hours and a firm price. You talk to flat-roof specialists, not a call centre.
+39 351 481 6739