Waterproofing under mosaic and zellige in Chichaoua
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Looking for a specialist for waterproofing under mosaic and zellige in Chichaoua? Flat roofs, terraces and waterproofing are all we do, in Marrakech and across the Haouz. Free survey, written quote within 24 hours and a firm price before the first roller stroke. Not a general builder: a flat-roof specialist.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Waterproofing under mosaic and zellige in Chichaoua: the job
Treated water attacks anything not designed for it: waterproofing under mosaic and zellige in Chichaoua with systems built for permanent contact. The riad-basin build-up: flexible membrane, water-resistant adhesive, epoxy joints. The zellige shines, the waterproofing works underneath. The indicative spend is 280–500 DH/m²; the final figure is written before we start.
Trusted in Chichaoua
“For waterproofing under mosaic and zellige I had three quotes: theirs wasn’t the cheapest but it was the only one itemised line by line. Price respected to the dirham.”
James H. · Chichaoua“They re-waterproofed without demolishing: no rubble in the stairwell, a tidy site every evening. The neighbours noticed nothing.”
William G. · Chichaoua“Our riad terrace was redone respecting the Medina’s constraints: materials carried in by hand, parapets rebuilt, zellige preserved. True specialist work.”
Fatima Z. · ChichaouaThe Chichaoua context
Chichaoua — both the road and the province — is seeing fast housing growth: new houses along the Marrakech–Essaouira axis, small residences, farms converted into guesthouses. Flat roofs are the rule there, and waterproofing is often the local builders’ last priority: a quickly laid bitumen layer, no upturns, drains pouring water down the facades. We work along the whole Chichaoua road — from Tamensourt to the provincial capital — with the same methods as in Marrakech: diagnosis, written quote, warranted systems. For rural guesthouses, a watertight, usable terrace is also a direct selling point.
People who call us from Chichaoua for waterproofing under mosaic and zellige often already have two or three quotes: ours stands out because it is written line by line and the price never moves afterwards.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Waterproofing under mosaic and zellige | 280–500 DH/m² | turnkey, finish included |
| Concrete pool waterproofing | 250–450 DH/m² | same service, different work |
| Basin and fountain waterproofing | 200–400 DH/m² | same service, different work |
| Hammam waterproofing | 300–550 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Indicative 2026 prices, labour and materials included. The final amount is locked in writing after the free survey.
How we work: four steps
Free visit on site
We travel in Chichaoua at no cost: we measure, we listen, and we propose the simplest, most durable solution.
Price locked in writing
The quote arrives within 24 hours and never moves once the works have started: no extras, no surprises.
Works with certified materials
Branded membranes, resins and primers, applied to the technical data sheet: a well-waterproofed terrace lasts 15 to 20 years, not two.
Testing, tidiness, warranty
We check the water run-off, deliver a clean site and leave the written warranty of the completed works.
Frequently asked questions: Waterproofing under mosaic and zellige in Chichaoua
In Marrakech, summer evaporation reaches 1–2 cm a day, no more. If you lose more, or if the level drops with the pump off, it is a leak: we locate it without fully draining the pool.
Yes — it is the classic build-up of riad basins: two coats of flexible waterproofing mortar, then zellige laid with water-resistant adhesive and epoxy joints. Beautiful on top, watertight underneath.
Yes: heat, steam, standing water. We use systems resistant to steam and thermal cycling, with high upturns on the walls and specific treatment of the floor-to-wall junction.
Allow 7 to 14 days after application ends, depending on the system (full curing is mandatory). We give you the refilling date in writing in the works schedule.
Let’s talk about it on site in Chichaoua
Every terrace starts with a real measurement. Message us on WhatsApp: we come and look at your roof in Chichaoua, free of charge and without obligation, and leave you a firm written price.
+39 351 481 6739