Top-floor ceiling insulation in Medina
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
If you are comparing quotes for top-floor ceiling insulation in Medina, here you will find real prices in dirhams, honest timelines and a team that only does flat roofs and terraces. The survey costs nothing and the quote is firm: no surprises at the end of the job.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Top-floor ceiling insulation in Medina: the job
Top-floor ceiling insulation in Medina starts with measuring: surface temperatures, membrane condition, possible thicknesses. The from-the-inside solution when the terrace can’t be redone: insulation boards and a clean finish, room by room. The indicative cost is 90–180 DH/m²; after the free survey, the price is fixed in writing and locked.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Top-floor ceiling insulation | 90–180 DH/m² | turnkey, finish included |
| Riad terrace insulation | 180–320 DH/m² | same service, different work |
| XPS boards under screed | 120–220 DH/m² | same service, different work |
| Combined insulation + waterproofing | 280–480 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
2026 reference values for Marrakech and its region, installation included. The exact quote — free and firm — is set only after measuring on site.
How we work: four steps
Free survey in Medina
We come and measure on site, free of charge and without obligation: membrane condition, falls, drains, upturns and every weak point of your flat roof.
Written quote within 24 hours
You receive an offer itemised line by line: materials, labour, timelines. The price is firm and locked in writing.
Tidy, protected site
We protect stairwells, facades and plants; we work zone by zone and leave the site clean every evening.
Testing and written warranty
Water-tightness test before handover. You leave with a written warranty of up to 10 years and after-works follow-up.
Trusted in Medina
“Our riad terrace was redone respecting the Medina’s constraints: materials carried in by hand, parapets rebuilt, zellige preserved. True specialist work.”
Thomas B. · Medina“Serious people: protection everywhere, deadlines kept, and the terrace handed back cleaner than they found it.”
Oliver P. · Medina“For top-floor ceiling insulation they recommended the simplest solution, not the most expensive one. You can tell they are technicians, not salesmen.”
Nadia B. · MedinaThe Medina context
The Marrakech Medina is our home ground: hundreds of riads with centuries-old flat roofs built from earth, cedarwood and lime, where traditional waterproofing — rammed earth layers and tadelakt — is reaching the end of its life. Every job here must respect ADER rules and the UNESCO listing: no hauling tonnes of rubble through narrow derbs, no altering the roofline of the terraces. We use light materials compatible with pisé: flexible resins, flame-free self-adhesive membranes, parapet upturns rebuilt to standard. Leaks in the Medina are unforgiving: they rot the wooden beams, swell the earthen walls and lift the tadelakt off bedroom walls.
For top-floor ceiling insulation in Medina we bring the same care as on our central Marrakech sites: certified materials, proper application and a clean handover, every time.
Frequently asked questions: Top-floor ceiling insulation in Medina
Typically 5 to 8 °C less in the rooms under the roof, measured in summer. The air conditioning kicks in less often and nights become bearable without running it all night.
From the roof, whenever possible: you treat the slab where the heat enters and protect the waterproofing at the same time. Ceiling insulation remains useful when the terrace can’t be redone (constraints, budget).
Warm roof: insulation under the membrane. Inverted roof: XPS boards laid over the membrane, which then stays at a stable temperature and lasts longer. In Marrakech we strongly favour the inverted build-up for that reason.
Yes, if the existing membrane is sound: we lay the XPS as an inverted roof directly over it. If the waterproofing is end-of-life, combining both is the most economical option.
Let’s talk about it on site in Medina
Every terrace starts with a real measurement. Message us on WhatsApp: we come and look at your roof in Medina, free of charge and without obligation, and leave you a firm written price.
+39 351 481 6739