XPS boards under screed in Amizmiz
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Looking for a specialist for xPS boards under screed in Amizmiz? Flat roofs, terraces and waterproofing are all we do, in Marrakech and across the Haouz. Free survey, written quote within 24 hours and a firm price before the first roller stroke. Not a general builder: a flat-roof specialist.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
XPS boards under screed in Amizmiz: the job
A top floor you can live in during summer without the AC flat out: xPS boards under screed in Amizmiz treats the heat where it enters — through the roof. Insulation built into the terrace rebuild: XPS, sloped screed, waterproofing — a single job that treats everything. The indicative spend is 120–220 DH/m²; the final figure is written before we start and never changes.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| XPS boards under screed | 120–220 DH/m² | turnkey, finish included |
| Flat-roof thermal insulation | 150–300 DH/m² | same service, different work |
| Warm roof (insulation under membrane) | 200–350 DH/m² | same service, different work |
| Inverted roof insulation | 220–380 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Indicative 2026 prices, labour and materials included. The final amount is locked in writing after the free survey.
The Amizmiz context
Amizmiz and its douars were hit by the September 2023 earthquake: reconstruction is under way, and with it a new requirement — rebuilding roofs that no longer leak. On rebuilt or strengthened houses, roof waterproofing is the weak point of jobs done in a hurry: slabs poured fast, no upturns, improvised drainage. We work in Amizmiz with solutions suited to earthen housing and small recent slabs: light membranes, careful upturns, corrected falls, and pricing designed for reconstruction budgets. Every watertight roof is a house that gets through the Atlas winter without damage.
In Amizmiz, jobs like xPS boards under screed are among the most requested: with summers above 45 °C and rain concentrated in winter, a well-laid membrane and correct falls make the difference between a terrace that lasts and one that has to be redone.
How we work: four steps
Free visit on site
We travel in Amizmiz at no cost: we measure, we listen, and we propose the simplest, most durable solution.
Price locked in writing
The quote arrives within 24 hours and never moves once the works have started: no extras, no surprises.
Works with certified materials
Branded membranes, resins and primers, applied to the technical data sheet: a well-waterproofed terrace lasts 15 to 20 years, not two.
Testing, tidiness, warranty
We check the water run-off, deliver a clean site and leave the written warranty of the completed works.
Trusted in Amizmiz
“We called them for xPS boards under screed, then called them back for my parents’ roof. Nothing more to add.”
Isabelle C. · Amizmiz“A leak in the middle of the rainy season: fast response, temporary weatherproofing then the final repair at the quoted price.”
Claire D. · Amizmiz“I was looking for an alternative to full demolition: liquid membrane and the terrace was like new in three days. I wish I had called earlier.”
Henry W. · AmizmizFrequently asked questions: XPS boards under screed in Amizmiz
No: everything happens on the roof, within a limited thickness (6–10 cm). In the Medina it is an ADER-compatible solution, as nothing is visible from the street.
From 120 to 300 DH/m² depending on the system: warm roof 150–300 DH/m², inverted roof 220–380 DH/m², inside insulation 90–180 DH/m². Combined with waterproofing, expect 280–480 DH/m² — less than two separate jobs.
Typically 5 to 8 °C less in the rooms under the roof, measured in summer. The air conditioning kicks in less often and nights become bearable without running it all night.
From the roof, whenever possible: you treat the slab where the heat enters and protect the waterproofing at the same time. Ceiling insulation remains useful when the terrace can’t be redone (constraints, budget).
Free quote for xPS boards under screed in Amizmiz
Message us on WhatsApp or fill in the form above: free survey, written offer within 24 hours and a firm price. You talk to flat-roof specialists, not a call centre.