Flat-roof and terrace waterproofing specialists in Marrakech and 10 areas — free survey and quote +39 351 481 6739
Roof insulation · Medina

XPS boards under screed in Medina

Free survey · written quote in 24 h · firm price in writing

Rainy season Nov–Mar · act before the first leak

Free quote within 24 hours

Leave your details: we call you back and book the free survey, at no cost and with no obligation.

We call you back within 24 working hours. No spam, guaranteed.

Medina: we carry out xPS boards under screed with waterproofing systems proven under the Marrakech climate — extreme summer heat, concentrated rain from November to March. You pay only after reading the quote: free, written and without obligation.

Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.

XPS boards under screed in Medina: the job

A top floor you can live in during summer without the AC flat out: xPS boards under screed in Medina treats the heat where it enters — through the roof. Insulation built into the terrace rebuild: XPS, sloped screed, waterproofing — a single job that treats everything. The indicative spend is 120–220 DH/m²; the final figure is written before we start and never changes.

XPS boards under screed in Medina — Marrakech

What it costs: 2026 prices

What xPS boards under screed costs in Medina: 2026 rates
WorkIndicative price 2026Notes
XPS boards under screed120–220 DH/m²turnkey, finish included
Flat-roof thermal insulation150–300 DH/m²same service, different work
Warm roof (insulation under membrane)200–350 DH/m²same service, different work
Inverted roof insulation220–380 DH/m²same service, different work
Survey and written quotefreeno obligation, locked price

Real 2026 price ranges: every roof is different, which is why we only put the final figure in writing after the free survey. And it never changes.

How we work: four steps

1

Free on-site diagnosis

A specialist — not a salesman — comes in Medina to record measurements, moisture and critical points, and to understand what is really needed.

2

Firm offer, line by line

Within 24 hours, the written quote: the figure you read is the final one, valid and locked.

3

Fast, careful intervention

Agreed time slots, protection everywhere, certified materials: the house stays liveable during the works.

4

Handover and final check

Flood or hose test, before/after photos, ten-year warranty: everything is handed over in writing.

Trusted in Medina

“A leak in the middle of the rainy season: fast response, temporary weatherproofing then the final repair at the quoted price.”

Thomas B. · Medina

“I was looking for an alternative to full demolition: liquid membrane and the terrace was like new in three days. I wish I had called earlier.”

Rachid T. · Medina

“Water came through the living-room ceiling every time it rained. Survey on Thursday, quote the next day, work finished in four days. Not a drop since.”

Thomas B. · Medina

The Medina context

The Marrakech Medina is our home ground: hundreds of riads with centuries-old flat roofs built from earth, cedarwood and lime, where traditional waterproofing — rammed earth layers and tadelakt — is reaching the end of its life. Every job here must respect ADER rules and the UNESCO listing: no hauling tonnes of rubble through narrow derbs, no altering the roofline of the terraces. We use light materials compatible with pisé: flexible resins, flame-free self-adhesive membranes, parapet upturns rebuilt to standard. Leaks in the Medina are unforgiving: they rot the wooden beams, swell the earthen walls and lift the tadelakt off bedroom walls.

For xPS boards under screed in Medina, the survey is free and the quote firm: you know exactly what you pay before we start, and the warranty is in writing.

Frequently asked questions: XPS boards under screed in Medina

Typically 5 to 8 °C less in the rooms under the roof, measured in summer. The air conditioning kicks in less often and nights become bearable without running it all night.

From the roof, whenever possible: you treat the slab where the heat enters and protect the waterproofing at the same time. Ceiling insulation remains useful when the terrace can’t be redone (constraints, budget).

Warm roof: insulation under the membrane. Inverted roof: XPS boards laid over the membrane, which then stays at a stable temperature and lasts longer. In Marrakech we strongly favour the inverted build-up for that reason.

Yes, if the existing membrane is sound: we lay the XPS as an inverted roof directly over it. If the waterproofing is end-of-life, combining both is the most economical option.

Free quote for xPS boards under screed in Medina

Message us on WhatsApp or fill in the form above: free survey, written offer within 24 hours and a firm price. You talk to flat-roof specialists, not a call centre.

+39 351 481 6739

Read more

WhatsApp Free quote