XPS boards under screed in Palmeraie
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Our trade fits in one line: terraces and flat roofs. For xPS boards under screed in Palmeraie we bring the experience of hundreds of roofs across Marrakech and the Haouz, branded materials and a price fixed before we start. Message us on WhatsApp or use the form: reply within 24 hours.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
XPS boards under screed in Palmeraie: the job
A top floor you can live in during summer without the AC flat out: xPS boards under screed in Palmeraie treats the heat where it enters — through the roof. Insulation built into the terrace rebuild: XPS, sloped screed, waterproofing — a single job that treats everything. The indicative spend is 120–220 DH/m²; the final figure is written before we start and never changes.
The Palmeraie context
In the Palmeraie, terraces match the scale of the villas: 150 to 400 m² of flat roof, often fitted out as a solarium, summer lounge or outdoor kitchen, on buildings surrounded by century-old palm trees. These large surfaces expand strongly under the sun: without movement joints and a flexible system, cracks are inevitable. Typical requests in the area: re-waterproofing 300 m² without closing down the villa, fixing leaks around pergolas anchored into the slab, waterproofing garden basins and water features. We plan these jobs zone by zone so the house stays liveable, with materials rated for high surface temperatures.
In Palmeraie, as everywhere in Marrakech, waterproofing is the poor relation of recent construction: xPS boards under screed is the safest way to put the roof right before a small leak becomes a major damage.
How we work: four steps
Free survey in Palmeraie
We come and measure on site, free of charge and without obligation: membrane condition, falls, drains, upturns and every weak point of your flat roof.
Written quote within 24 hours
You receive an offer itemised line by line: materials, labour, timelines. The price is firm and locked in writing.
Tidy, protected site
We protect stairwells, facades and plants; we work zone by zone and leave the site clean every evening.
Testing and written warranty
Water-tightness test before handover. You leave with a written warranty of up to 10 years and after-works follow-up.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| XPS boards under screed | 120–220 DH/m² | turnkey, finish included |
| Flat-roof thermal insulation | 150–300 DH/m² | same service, different work |
| Warm roof (insulation under membrane) | 200–350 DH/m² | same service, different work |
| Inverted roof insulation | 220–380 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Real 2026 price ranges: every roof is different, which is why we only put the final figure in writing after the free survey. And it never changes.
Frequently asked questions: XPS boards under screed in Palmeraie
No: everything happens on the roof, within a limited thickness (6–10 cm). In the Medina it is an ADER-compatible solution, as nothing is visible from the street.
From 120 to 300 DH/m² depending on the system: warm roof 150–300 DH/m², inverted roof 220–380 DH/m², inside insulation 90–180 DH/m². Combined with waterproofing, expect 280–480 DH/m² — less than two separate jobs.
Typically 5 to 8 °C less in the rooms under the roof, measured in summer. The air conditioning kicks in less often and nights become bearable without running it all night.
From the roof, whenever possible: you treat the slab where the heat enters and protect the waterproofing at the same time. Ceiling insulation remains useful when the terrace can’t be redone (constraints, budget).
Trusted in Palmeraie
“I was looking for an alternative to full demolition: liquid membrane and the terrace was like new in three days. I wish I had called earlier.”
Karim E. · Palmeraie“Water came through the living-room ceiling every time it rained. Survey on Thursday, quote the next day, work finished in four days. Not a drop since.”
Oliver P. · Palmeraie“For xPS boards under screed I had three quotes: theirs wasn’t the cheapest but it was the only one itemised line by line. Price respected to the dirham.”
Leïla H. · PalmeraieQuote within 24 hours, locked price
One WhatsApp message is enough: for xPS boards under screed in Palmeraie you receive an itemised offer with no hidden costs. Written warranty on the works, up to 10 years.
+39 351 481 6739