Renovation before holiday letting in Medina
Free survey · written quote in 24 h · firm price in writing
Rainy season Nov–Mar · act before the first leakFree quote within 24 hours
Leave your details: we call you back and book the free survey, at no cost and with no obligation.
Medina: we carry out renovation before holiday letting with waterproofing systems proven under the Marrakech climate — extreme summer heat, concentrated rain from November to March. You pay only after reading the quote: free, written and without obligation.
Rainy season Nov–Mar: The Marrakech rainy season runs from November to March: that is when every tired terrace reveals itself. An ignored leak costs up to 10 times the price of waterproofing — damaged beams, lifted tadelakt, mould, repainting — and cuts the value of the property. The right time to waterproof is before the first heavy rain, not after it.
Renovation before holiday letting in Medina: the job
Renovation before holiday letting in Medina starts with controlled stripping: we remove what is dead, we rebuild the waterproofing, the falls and the finish. A watertight, presentable terrace is a letting argument — and tourist-licence inspections look at the property’s condition. We schedule ahead of your season. The indicative cost is 280–500 DH/m²; after the free survey, the price is locked in writing.
The Medina context
The Marrakech Medina is our home ground: hundreds of riads with centuries-old flat roofs built from earth, cedarwood and lime, where traditional waterproofing — rammed earth layers and tadelakt — is reaching the end of its life. Every job here must respect ADER rules and the UNESCO listing: no hauling tonnes of rubble through narrow derbs, no altering the roofline of the terraces. We use light materials compatible with pisé: flexible resins, flame-free self-adhesive membranes, parapet upturns rebuilt to standard. Leaks in the Medina are unforgiving: they rot the wooden beams, swell the earthen walls and lift the tadelakt off bedroom walls.
For renovation before holiday letting in Medina, the survey is free and the quote firm: you know exactly what you pay before we start, and the warranty is in writing.
How we work: four steps
Free visit on site
We travel in Medina at no cost: we measure, we listen, and we propose the simplest, most durable solution.
Price locked in writing
The quote arrives within 24 hours and never moves once the works have started: no extras, no surprises.
Works with certified materials
Branded membranes, resins and primers, applied to the technical data sheet: a well-waterproofed terrace lasts 15 to 20 years, not two.
Testing, tidiness, warranty
We check the water run-off, deliver a clean site and leave the written warranty of the completed works.
What it costs: 2026 prices
| Work | Indicative price 2026 | Notes |
|---|---|---|
| Renovation before holiday letting | 280–500 DH/m² | turnkey, finish included |
| Waterproofing + tiling overhaul | 350–550 DH/m² | same service, different work |
| Zellige terrace renovation | 380–600 DH/m² | same service, different work |
| Re-sloping and drainage upgrade | 150–280 DH/m² | same service, different work |
| Survey and written quote | free | no obligation, locked price |
Indicative 2026 prices, labour and materials included. The final amount is locked in writing after the free survey.
Frequently asked questions: Renovation before holiday letting in Medina
Yes: we regularly work under ADER rules — no change to the external appearance, materials hand-carried, rubble removal adapted to pedestrian derbs.
Partially: we split the site into zones when the surface allows. On small terraces, expect a few days without access — we give you the exact calendar before starting.
Turnkey, expect 250–550 DH/m² depending on the substrate and the chosen finish: a 60 m² terrace usually runs 18,000–33,000 DH. The exact price — firm and written — comes after the free survey.
For a 40–80 m² terrace: 6 to 10 working days, plus screed drying time before the finish. We schedule everything in the quote, written dates included.
Trusted in Medina
“The terrace had been ponding for years: they rebuilt the falls, changed the drains and laid a proper membrane. No more ceiling stains.”
David K. · Medina“We called them for renovation before holiday letting, then called them back for my parents’ roof. Nothing more to add.”
Charlotte V. · Medina“A leak in the middle of the rainy season: fast response, temporary weatherproofing then the final repair at the quoted price.”
Mohammed A. · MedinaBefore the rainy season, make your terrace safe
From November to March, an ignored leak costs up to 10 times the price of waterproofing. WhatsApp or form: we can be in Medina within days for a free diagnosis.
+39 351 481 6739